Our principles
Muscat International Airport

Gredging Works and Soil Reclamation
Boskalis Westminster (RO 18,000,025)

Improving and strengthening the soil
Soletanche Pachy

Construction of channels to discharge wadi water and roadside paving works
Desert Line Projects (Muscat and Salalah RO 18,104,801)

Civil works development
Consolidated Contractors Company (CCC) and TAV Insat (Muscat and Salalah RO 450,000,000)

Design, supply, install, inspect and operate a new radar
Raytheon (RO 4,959,209)

Consultancy services for the design and supervision of hangars
Ghafari Associates (Muscat and Salalah RO 4,093,688)

Design and supervision of the construction of a cargo terminal
Ghafari Associates (Muscat and Salalah RO 1,458,305)

Designing and supervision of the construction of the catering building
Al Hatmy Engineering Consultancy (Muscat and Salalah RO 1,266,150)

Design and construction of 100-metre tall air traffic control tower
Current project

The agreements related to Muscat International Airport include the construction of the main road for the airport, a new blacktop along the internal corridors, as well as roads that connect all the airport entrances, roundabouts and the main road linking Sultan Qaboos Street. It also includes beautification of these roads with symbols of Omani architecture.

These projects are expected to be completed within two years. Also to be implemented is a second runway to allow for the rehabilitation of the present runway tarmac to handle huge planes. The project specifications meet the international specifications approved by the International Civil Aviation Organization.

Salalah Airport

Project manager to supervise the regional airports projects
ADPI (RO 6,619,000)

Supply, install, inspect and operate an automatic meteorology station and marine float
Microstep-MIS (RO 135,821)

Office building for meteorology
Lotus Modern International (RO 141,200)

Construction of channels to discharge wadi water and roadside paving works
Desert Line Projects (Muscat and Salalah RO 18,104,801)

Civil works development
Consolidated Contractors Company (CCC) and TAV Insat (Muscat and Salalah RO 450,000,000)

Consultancy services for the design and supervision of hangars
Ghafari Associates (Muscat and Salalah RO 4,093,688)

Design and supervision of the construction of a cargo terminal
Ghafari Associates (Muscat and Salalah RO 1,458,305)

Designing and supervision of the construction of the catering building
Al Hatmy Engineering Consultancy (Muscat and Salalah RO 1,266,150)

Passenger terminal
New Tender

Sohar Airport

PMC and consultancy; pre-design study, detailed design, tendering and construction supervision
Hamza Associates (50%), Robert & Company (25%), Burgess & Niple (25%) (RO 6,619,000)

Project manager to supervise the regional airports projects
ADPI (RO 6,619,000)

First stage of construction
Strabag Oman (RO 135,821)

The project will be executed in three stages; each stage will be tendered as a separate construction contract. Stage 1 includes the dredging works and site preparation, stage 2 includes the infrastructure works (roads, electricity and water networks, runway, taxiway, fire fight systems, and lighting), and stage 3 includes the construction of facilities (passenger and cargo terminals, and catering facility).

Al Duqm Airport

In 2009, the main construction contract for stage 2 is expected to be awarded. The project is expected to be completed in 2012.

Master plan design and construction consultant
Parsons International

Project manager to supervise the regional airports projects
ADPI (RO 6,619,000)

First stage of construction
Desert Line Projects (RO 23,375,000)

The project will be executed in three stages; each package will be tendered as a separate construction contract. Stage 1 includes the construction of roadways and utilities, stage 2 will include construction of the runways and airfield infrastructure and stage 3 involves the construction of the terminal buildings and other buildings on the site.

Adam Airport

Project manager to supervise the regional airports projects
ADPI (RO 6,619,000)

Additional works annex
Strabag Oman (RO 3,600,000)

Camel race track
Development and Maintenance Services (RO 504,930)

Haima Airport

Design and construction
New Tender

Ras Al Had Airport

Design and construction supervision consultancy
Pryde Schropp McComb, Inc. (PSMI) in association with Gulf Engineering & Consultants of Oman

Shaleem Airport

Design and construction
New Tender

Other projects

Meteorology co-operation project
European Organisation for the Exploitation of Meteorological Satellites

Aircraft Maintenance Facility
New Tender